【 | Case Study】

Using a hard ground clearing method that can press in steel sheet piles and steel pipe piles even in the impenetrable ground, installing a fly foil type auger attachment improves construction efficiency and succeeds in significantly shortening construction time.

*Check a case study at the related URL on the bottom of this page if the case study is not shown.

Detail of the article:https://www.giken.com/ja/news/magazine/backnumber09/

Service provider : GIKEN LTD.
Service user : -

Back to case lists